Project Topics

www.seminarsonly.com

Engineering Projects

Published on Nov 30, 2023

Abstract

In software industry, the major problem is meeting the clients requirements with specific to a software project development is the deliverables that should be promised to the client. The client standardizes himself to a contract and fixes a specific time onto the systems, when the project has to be delivered.

Once the software development contract is signed, the actual task on scheduling the manpower and machine requirements arises. In scheduling the manpower and machine requirements arise. In a software development process, if the manpower is not organized properly then it can cause a great lot of have in reaching the targets.

The major goal of any software development firm is to meet the targets as fast as possible with the least manpower, to get targeted profits. The other area where the software developments firm are interested are with respect to the management of library with specific to the previous project development processes. The application training the bugs and their associated tescases that were developed previously also plays a vital role.

The software project management solutions, is an application that kinds itself with the overall standards of managing a project at all levels of its development processes. The application is projected towards the maintenance of data, that is utmost necessary to know the state and status of a project that is undergoing through the process of development.

The major intension its to maintain the history of all the components that have been developed for a specific projects along with the associated information about the software engineer who has been involved in the process of development of that component. This type of standard always helps the industry not only in managing the Human Resources properly but also help to keep down the maintenance upon the system. The history of information also helps in keeping the standards of bug tracking and bug management much easier, flexible and faster.

The project has been planned to be having the view of distributed architecture, with centralized storage of the database. The application for the storage of the data has been planned. Using the constructs of MS-SQLServer2000 and all the user interfaces have been designed using the ASP.Net technologies. The database connectivity is planned using the "SQL Connection" methodology. The standards of security and data protective mechanism have been given a big choice for proper usage. The application takes care of different modules and their associated reports, which are produced as per the applicable strategies and standards that are put forwarded by the administrative staff

Proposed System :

Objectives Of the Proposed System

To generate the quick reports

To make accuracy and efficient calculations

To provide proper information briefly

To provide data security

To provide huge maintenance of records

Flexibility of transactions can be completed in time

After understanding the existing system and understanding the need for developing a new system different people involved in the related activities have been consulted. The data needed for the study has been collected from company records.

The computerization of this system would avoid the wrong interpretation and bad calculation of data .The system help the user to see any documents, source code, tasks, activities, team information with details at the click of a button. The record data is maintained and backed up such a way that data is not loss. The speed of the system could also increased

Hardware Requirements :

Intel P4 1.5GHz or above

512MB RAM

80GB HDD Minimum

Software Requirements :

OPERATING PLATFORM : WINDOWS 2000/NT/XP

RDBMS : SQLSERVER 2000

SOFTWARE : VS.NET 2003

FRONT END TOOL : ASP.NET